Cambridge House

Key Facts

Value:
£1m
Sector:
Programme:
24 Weeks
Scope of work:
Vertical extension to the 5th floor of an occupied building in the centre of Bath with inclusion of 3rd and 4th floor refurbishment.

The completion of this complex fast track project was successfully completed on time and within budget with various spaces being let during the course of the build.

The 5th floor extension comprised of complex steel frame erection and carefully sequenced temporary works to ensure the disturbance to Southgate shopping centre was kept to a minimum.

On completion of the structure to the 5th floor and its roofing and cladding packages, the fit out elements commenced and at a fast pace. This was controlled through detailed programming which allowed the project to be finished, snagged and handed over to an exceptional standard.

Back to Project Sectors: Commercial | Education | Healthcare | Heritage | Residential