15th July 2020

University of Bath 2 West external works progress

Following hot on the heels of the internal phase, this month we have struck the protective scaffold wraps and handed over the external elevations to our delighted client.

To complete these works we constructed engineer designed plinths as part of a robust weathering and thermal solution, which ensured the composite windows will perform as design, this solution ensured that minimal intervention with the existing cladding and building fabric was required.