11th May 2023

601 Whitchurch Lane news

The weather was incredible yesterday at our site at 601 Whitchurch Lane in Bristol. The sun was shining and there were only a few clouds in the sky, the perfect environment for the works being continued on the roofs.

This week our groundworks sub-contractor Kore Construction have been preparing slabs in Block A together with the installation of wind catchers in Block B. Internal walls will be going up in Block C and the concrete slab has been poured in Block B as can be identified in these images.

We hope this spell of sunshine continues as we work our way through Spring!