The project provides a new staff room, offices and small tutor spaces alongside the extra space provided by the new classrooms.
The entire school was re-roofed during the build and the existing hall was doubled in size.
The school remained fully occupied throughout the duration of the build and we carried out a number of interactive initiatives with the pupils including the signing of the steel beams, drawing and junk modelling competitions and H&S talks.