Wellington Eagles Primary Academy was negotiated with Bray and Slaughter through our existing relationship with Wiltshire Council.
Works comprised of the design and construction of a new 2 Form Entry Primary Academy together with a 30-place nursery and external works including the refurbishment of an existing car park, the provision of a football pitch and a Multi Use Games Area.
Construction works include significant earthworks to form new levels; installation of foundations and substructure; erection of steel frame; ground bearing floor slab and precast plank first floor; installation of pitched standing seam roof and membrane flat roofs, fitting of windows, M&E installation and interior fit-out and surface finishes.